Be interesting to see the 'build quality' of the ballast ingots and how they just slot in, etc.

?? I made a batch of lead weights for use when I laid the decking, so these will have first call on any need for trim ballast!

I now feel like I’ve let you down though as they don’t slot together - I may have to recast them! ??

D16F30C9-4044-4B32-9E20-13831E1187D4.jpeg
 

Bouba

Well-known member
Joined
6 Sep 2016
Messages
39,905
Location
SoF
Visit site
?? I made a batch of lead weights for use when I laid the decking, so these will have first call on any need for trim ballast!

I now feel like I’ve let you down though as they don’t slot together - I may have to recast them! ??

View attachment 134679
I’m a bit shocked to be honest ? ....we were only kidding about the ballast....you are not a man to be taken lightly...
 

JOHNPEET

Well-known member
Joined
24 Sep 2002
Messages
428
Location
Anglesey
Visit site
Seat boxes for the aft deck and fly bridge!

So I chose to make my own seat boxes for a couple of reasons - I had plans to house some equipment in a couple of the boxes and so they needed to be sealed to the decks so that services could be routed into the boxes and not have any issues with leaks to below. The fly bridge deck and aft decks are curved so the seat boxes needed to follow the same profile. The second reason was that the few options available on the marketplace are just ridiculously expensive!
The seat box on the aft deck on the starboard side houses the gas cylinders and associated equipment. The rear most seat base on the fly bridge houses the ventilation outlet for the aft cabin shower extract and also an engine space extract fan which will be used when the generator is running but no main engines - just had some concern about the temp in the engine space with the generator running.

The boxes bases were laid up in two stages - first stage was to produce a box with no base, then scribe the profile of the deck curvature and cut. Second stage was to layup the bottom of the base into the box once cut.

12952C78-1F25-401C-8B77-146F0864D3AB.jpeg515B58D4-ACE8-4160-8AAC-A7123645FA9C.jpegE7B24555-D2E1-4205-BDFE-7C113AA33249.jpegE1CA089E-D06A-4D8B-9FF2-9CF40F36B1D2.jpeg3862B65A-22AA-4FC3-B324-77E5FB27E956.jpeg2BF768F0-C3B5-47BE-91F8-62E77A6E1D59.jpeg0F271DC1-86AC-4132-8CF7-645562E27DB8.jpeg45A594E2-234A-4897-B060-8E65B095D2D4.jpeg41AB97C2-7838-442C-91AC-F05C71F76C5D.jpeg2B194DDA-1EE9-4D18-86ED-70D840737EE1.jpegDB8776D2-88BD-4D7D-988C-424C65E8808A.jpeg36E1E733-6E14-46E0-92BE-9C521A13C9C4.jpeg
 

Greg2

Well-known member
Joined
24 Jun 2002
Messages
4,346
Visit site
Steel, welding, carpentry, plumbing, electrics and now we have fibreglass mouldings to perfection!

There is only so much a man can take! ?
 

Bouba

Well-known member
Joined
6 Sep 2016
Messages
39,905
Location
SoF
Visit site
I am wondering how long the build took.
Perfection takes time...I for one am not looking at this as a boat build or even as a finished product...if a craftsman goes to work each day and produces fine work then that is the story in itself...even if it takes forty years and he doesn’t have a finished product...ie it’s the journey not the destination
 