New member
I should like your opinions on the following I have on board my boat one a victron inverter charger 50a@24v the other 2x25a@24v.sterling
I have the victron connected in the normal manner via change over switch to select either generator or shore supply.
In this manner when shore supply or generator is available this is the supply i get but if either fails inverter automatically switches on.
what I do at the moment when at anchor is manually switch on the 2 sterlings i should like this to be performed automatically so i have made up a panel with a time delay wired in series.
What I would like to know is what delay should I have to avoid spikes Sterling would not give an opinion stating it was a generator problem.
I have the victron connected in the normal manner via change over switch to select either generator or shore supply.
In this manner when shore supply or generator is available this is the supply i get but if either fails inverter automatically switches on.
what I do at the moment when at anchor is manually switch on the 2 sterlings i should like this to be performed automatically so i have made up a panel with a time delay wired in series.
What I would like to know is what delay should I have to avoid spikes Sterling would not give an opinion stating it was a generator problem.