Pye_End
Well-known member
Can't see the point. Harwich breakwater to Pye End is 1nm. Harwich lifeboat to Pye End is 2nm. Titchmarsh is more like 3.5nm to Pye End - with a load of moorings to go through (surely not at full throttle).As you raise it, there is no need for a new station at Walton as the boat could operate from the Backwaters at minimal costs but from an operational perspective, Harwich can cover the Walton patch so this is all about hearts and minds and has been handled badly.