BartW
Well-Known Member
I'm still a bit worried about heat and would want some technical analysis on that, but I might be over-worrying. I guess i am concerned that the fin area has been restricted to reduce power and heat generation when at anchor, because 1m sq feels right to me (and doesn't even look especially big on an 80 foot boat)
....................
Are you thinking of going ahead with this idea before the start of 2013 season BartW?
at the moment I'm going ahead as if it is a pre 2013 summer project;
- DL is involved, has done a similar project with a SunS
- The former Canados teamboss is tracing the orriginal Canados Engineers and orriginal Canados info (they are old and slow remember ;-) )
- The weekend after next, I will try to make as many measurements as possible, ao stringers, frames, thikness of the hull, (two methods) ;-), underwatership, .....
- Today I had a phone call from that yard in SOF,(he called me coincidently) I made a appointment for next friday to talk about our plans
- got a mail today from CMC, they didn't say no to our pragmatic approach, but nevertheless insist on a good job.
- bottom line, I don't think that a retrofit hydraulic driven system is practically feaseable, leaves one solution, and me getting old.
BUT
if it turns out that there is a serous bumb in the road, I can skip or postpone the project.
nothing signed yet.
If you have some serious arguments against, pls let me know
here is a pic I've got today from a installed system in a "Moonen", which is "in a tank" (not very clear from the pic)
so no extra ventilation
Last edited: