jimi
Well-known member
I’ve done Torquay to Hythe in one hit single handed in my old Bennie 331. I aimed to get off Portland before slack just as flood startsas I wanted a full favourable tide Portland to the Needles. I carried the tide to the Needles where it turned. I used the inshore back currents to get into the Solent and then up Hythe. It was a few years ago and log book is on boat but I think it was c16 hours berth to berth