simonfraser
Well-Known Member
making sure all the parts are accessible, tappets require adjustment
what other parts of the engine are needed for routine access ?
what other parts of the engine are needed for routine access ?
making sure all the parts are accessible, tappets require adjustment
what other parts of the engine are needed for routine access ?
At least its good to see that the valve clearance has been checked at least once as evidenced by the aluminium washers on the leakoff rail. The originals were copper and are covered in green paint when the engine was built. If you have a 44/300 with solid green paint on the rail and injector pipes then they haven't been disturbed, something I have pointed out to several owners over the years who had been told they had been done previously by their mechanic or workshop. And it looks like they haven't been done the quick cowboy method by bending the injector pipes where they angle up over the rocker cover, again I have seen this done by 'proff' mechanics.
If it hasn't done 200 hrs yet since they were last done then you are ok until 200hrs.
Very poor engine installation with the group of cables draped over the top of the intercooler and its inlet pipe that's gets very hot.
How much would it cost to do this on a KAD 44 EDC?
I have just been quoted £90 for both my engines, 1.5 hrs in total, I thought that was cheap TBH but being done during full engine service.
I have just been quoted £90 for both my engines, 1.5 hrs in total, I thought that was cheap TBH but being done during full engine service.
tnx, in a 'proper' experienced workshop ?
I would be surprised if they could do this properly in that time, usually about 4 hours for both when I enquired