Watchet dredging well underway.

38mess

Well-known member
Joined
9 Apr 2019
Messages
6,862
Location
All over the shop
Visit site
I have had responses from both the Watchet Harbour Manager and Western Marinas to say that the dredging is about 60% complete and work to repair the gate should start in February.
I haven't been able to get over to watchet but that's great if true
 
Last edited:

38mess

Well-known member
Joined
9 Apr 2019
Messages
6,862
Location
All over the shop
Visit site
Until the gate is working it it still going to dry out and many of the finger berths have been moved to allow better access for the dredger.
CMG were using that dredger, it seemed to make some difference, but every tide brings the silt back in. The harbour needs constant dredging which is not feasible.
 

PCUK

Well-known member
Joined
29 Jun 2005
Messages
8,195
Location
Westleigh, Nr Tiverton, Devon.
Visit site
I disagree. The dredger is very effective, not digger effective, but still good. It cleared a large section of outer harbour a couple of years ago. I'm sure the new operators know that constant “service” dredging is needed to keep things clear.
 
Top