bluerm166
Well-Known Member
Anyone found a neat solution to providing a the third reef line ? i.e.from the leach cringle down to boom.
It makes for rather a long unmanageable line if left in place,and there is room for only nos.1 and 2 plus the outhaul within the boom anyway.
Rigging a line when a third reef is called for is possible but messy.I use the second reef line at the boom for the lower attachment,making #3 line shorter,but it's still fiddly.
It's probably possible to hook/snap a tailored tackle through the cringle to avoid having to sweat it down but leaving a block at the cringle would be undesirable.
Anybody pleased with their arrangement ?
It makes for rather a long unmanageable line if left in place,and there is room for only nos.1 and 2 plus the outhaul within the boom anyway.
Rigging a line when a third reef is called for is possible but messy.I use the second reef line at the boom for the lower attachment,making #3 line shorter,but it's still fiddly.
It's probably possible to hook/snap a tailored tackle through the cringle to avoid having to sweat it down but leaving a block at the cringle would be undesirable.
Anybody pleased with their arrangement ?