PaulRainbow
Well-Known Member
I also went the arch/gantry route but separate to the pushpit as it can cause leaks around the deck mounts with the extra load. Sloped it aft so also acts a davits.
Thanks Graham, the loading is something I had wondered about.
Loading is no problem with the Moody design. It replaces the original pushpit stanchions. The original pushpit was cut back away from the forward stanchion, the stanchion was then removed and the arch was fabricated so the from "goal post" of the arch replaces the original stanchions, the original pushpit tubing, where it goes around the transom was then extended and joined back to the front of arch and the original aft pushpit stanchions. The first picture in post #7 shows the original pushpit cut back away from the from arch support. The aft "goal post" is a new structure. All four deck mounting points are substantial and are through bolted with backing plates.
You can see the aft mounting here:


