Refueler
Well-Known Member
Season is drawing to a close ... night temps are in the single digit figures with possible -1 .. -2 at times ... luckily being near to Baltic Sea - that tends to hold our temps in Ventspils a few deg higher than inland.
Anisette (38ft Conqubin Cruiser Racer) is agreed to go down coast to Pavilosta for lift out ... painting and general works planned. This should be within a few days 0nce we see the weather .. spend night alongside removing sails / marking lines etc before mast unstepped / lift out next day.
Superanne (25ft Sunrider motor sailer) is at back of house sitting in the mud at present - rain stopped and wind from north has reduced river level enough for her to be stuck. Once rain or wind cxhanges - she should rise with river level and then move round to lifting area .. to be stood outside house. Needs to be completed inside cabin - cupboards / woodwork where removed old to repair the stbd bilge keel. Headlining to do in main cabin and WC area ..
LuLu (5m Progress 4 soviet speedboat) already lifted and she will move into the barn for cleaning up and repainting .. new floorboards .. new wood dashboard etc.
Lady Lu (5m Kormoran lift keel sailboat) is also already lifted and will receive further work as cabin new sole boards, headlining, fender strip on the hull-deck joint'
Seaone (Primor 24 motorboat) will be trailered out and then stood outside house .. needs various such as battery switches replaced / relocated to easier access, mains electric for charger etc, general clean up and painting of superstructure, installation of new speed and depth gear ...
That's only the items I can remember while typing ! And ... yes ... like most people - half will not get done !!
Anisette (38ft Conqubin Cruiser Racer) is agreed to go down coast to Pavilosta for lift out ... painting and general works planned. This should be within a few days 0nce we see the weather .. spend night alongside removing sails / marking lines etc before mast unstepped / lift out next day.
Superanne (25ft Sunrider motor sailer) is at back of house sitting in the mud at present - rain stopped and wind from north has reduced river level enough for her to be stuck. Once rain or wind cxhanges - she should rise with river level and then move round to lifting area .. to be stood outside house. Needs to be completed inside cabin - cupboards / woodwork where removed old to repair the stbd bilge keel. Headlining to do in main cabin and WC area ..
LuLu (5m Progress 4 soviet speedboat) already lifted and she will move into the barn for cleaning up and repainting .. new floorboards .. new wood dashboard etc.
Lady Lu (5m Kormoran lift keel sailboat) is also already lifted and will receive further work as cabin new sole boards, headlining, fender strip on the hull-deck joint'
Seaone (Primor 24 motorboat) will be trailered out and then stood outside house .. needs various such as battery switches replaced / relocated to easier access, mains electric for charger etc, general clean up and painting of superstructure, installation of new speed and depth gear ...
That's only the items I can remember while typing ! And ... yes ... like most people - half will not get done !!








