tillergirl
Well-Known Member
Only 1 UKHO Permanent NtM:
Confirmation of the recent local NtM on the River Blackwater - installation of Tollesbury Pier south cardinal buoy - Hope you all like the Pier...... (image of the position at http://www.crossingthethamesestuary.com/page9.html).
Temporary
1. Gravesend Reach of the Thames - the Tilbury Ro-Ro. Works this week;
2. Survey at the North Shipwash from tomorrow for about 3 days - an exclusion zone of 400 metres - see the image of the position I have added in the temporary list at the above web page);
3. Port of Wells - dredging, dredging...
4. Port of Ramsgate until 16th December at berths 2 and 3 - I assume are the Ro-Ro?
5. Lighthouse at Margate Pier now back lit.
That's it.
Confirmation of the recent local NtM on the River Blackwater - installation of Tollesbury Pier south cardinal buoy - Hope you all like the Pier...... (image of the position at http://www.crossingthethamesestuary.com/page9.html).
Temporary
1. Gravesend Reach of the Thames - the Tilbury Ro-Ro. Works this week;
2. Survey at the North Shipwash from tomorrow for about 3 days - an exclusion zone of 400 metres - see the image of the position I have added in the temporary list at the above web page);
3. Port of Wells - dredging, dredging...
4. Port of Ramsgate until 16th December at berths 2 and 3 - I assume are the Ro-Ro?
5. Lighthouse at Margate Pier now back lit.
That's it.