Neyland to Portishead

Would be interested, depending on timing etc-

I presume it won't be in 1st 3 weeks of November though?

"From Portishead eQuay newsletter:
Lock Shutdown Winter 2009
We are planning to undertake a lock shut-down for essential maintenance commencing on Monday 2nd November with the lock programmed to come back online no later than Friday 20th November. "

Paul
 
if you leave swansea 2hrs before low water and stay inside the sands you should make portishead you have 7hours off flood there is back in swansea bay close inside
 
Thanks to the combined efforts of Northern Rock and Bank of Scotland, the purchase has not yet been completed. It's beginning to look as if the delivery may be delayed.

I have to say that the incredible level of incompetence on the part of Northern Rock has been frightening. I won't trust them with the loose change in my pocket in future. Bank of Scotland are being unhelpful, but I'm not yet sure of their degree of culpability.
 
Finally today Northern Rock sorted things out and I am mightily mightily relieved. The feeling of having no control when there are tens of thousands of pounds floating off into the ether is not a pleasant one. Now I can start thinking about sailing again, albeit having missed several weekends of good sailing weather and now I'm facing the winter.

I have two weekends between handover and the proposed delivery to get everything in order. It's a bit of a tall order, but we'll see. I'll PM the people who showed an interest in the trip.
 
Top