Hacker
Well-Known Member
I'm considering a Moody 40 which has in-mast furling. I'd prefer to have a slab reefed version. Can anyone suggest a ball-park cost to replace the rig. I'm assuming it should include mast, boom, rigging and mainsail. I'm assuming that I will be able to reuse antennas, etc (if they are serviceable). I just want to have an idea of what the additional cost would be if I'm unable to find a slab-reefed version.