I am getting involved in a boat building project during this winter (in Scotland).
It is a 23ft, four-man rowing boat of epoxy bonded plywood lapstrake construction. The building site is in an unheated barn (perhaps slightly heated).
From what I have read , the minimum temperature for curing epoxy resin is 10C (50F). The problem at low temperatures seems to be that the components separate before the cure is complete.
We may not see 10C in this part of the world until April so any advice would be most welcome. Thanks
It is a 23ft, four-man rowing boat of epoxy bonded plywood lapstrake construction. The building site is in an unheated barn (perhaps slightly heated).
From what I have read , the minimum temperature for curing epoxy resin is 10C (50F). The problem at low temperatures seems to be that the components separate before the cure is complete.