AngusMcDoon
Well-known member
The main pier is being extended & a travel hoist dock being built with an expected lift capability of 50 tonnes.
Angus, is the hoist/crane unit the same one that was bought from Inverness 3-4 years ago? I'm thinking that it's all taking a bit longer than required, but if it is happening, overjoyed that it is. I reckon it's a good thing for us all.