mirage
New member
I have just received an invoice for a gel-coat repair from Wyatt Earp that quotes 5 hours labour.
The actual repair was on the edge of the deck when the anchor chain jumped off the roller, the damaged area was about 35 mm x 7 mm.
They slapped on gel-coat for about 100 mm, then rubbed it back a few days later.
Am I correct in thinking 5 hours labour is a bit excessive or am I being charged for them standing around waiting for it to go off ?
The actual repair was on the edge of the deck when the anchor chain jumped off the roller, the damaged area was about 35 mm x 7 mm.
They slapped on gel-coat for about 100 mm, then rubbed it back a few days later.
Am I correct in thinking 5 hours labour is a bit excessive or am I being charged for them standing around waiting for it to go off ?