bought the boat, rebuilt the engine and its running great. got it booked in to be lifted back into the boat and thought, i better replace the packing glands i the stuffing box. (sorry if aim using any wrong terminology)
pulled out 6 bits of square section string from the box. its a 2 nut type not a threaded packer if that makes sense. looked at the prop shaft and its a right old mess, pitting galore, i would say in places up to half a m deep. however the rest of the shaft between the box and the gearbox is in great condition.
so i thought, great, i will just get a longer piece of hose and all will be well, i have loads of free length on the prop shaft and nice stainless jubilee clips. so i cut off the hose that was on and sprayed the propshaft/gearbox coupling bolt with some double TT to shift these in the morning.
BUT. it was only when i cut of the hose (which seemed fairly thin from all have read about using reinforced tubing (maybe 4mm)) that i saw that the hull ad the stuffing box were located together with a notch/spline/slot. so 2 notches on the hull side and 2 notches on the stuffing box. so 90 degree segments fitting into each other.
the question being if i extend the hose will it matter that the two are not now mechanically locked together and are just relying on the hose for ant twisting?
i hope this all make sense and thanks in advance for any answers.
Mat
so. the situation i am in.
bought the boat, rebuilt the engine and its running great. got it booked in to be lifted back into the boat and thought, i better replace the packing glands i the stuffing box. (sorry if aim using any wrong terminology)
pulled out 6 bits of square section string from the box. its a 2 nut type not a threaded packer if that makes sense. looked at the prop shaft and its a right old mess, pitting galore, i would say in places up to half a m deep. however the rest of the shaft between the box and the gearbox is in great condition.
so i thought, great, i will just get a longer piece of hose and all will be well, i have loads of free length on the prop shaft and nice stainless jubilee clips. so i cut off the hose that was on and sprayed the propshaft/gearbox coupling bolt with some double TT to shift these in the morning.
BUT. it was only when i cut of the hose (which seemed fairly thin from all have read about using reinforced tubing (maybe 4mm)) that i saw that the hull ad the stuffing box were located together with a notch/spline/slot. so 2 notches on the hull side and 2 notches on the stuffing box. so 90 degree segments fitting into each other.
the question being if i extend the hose will it matter that the two are not now mechanically locked together and are just relying on the hose for ant twisting?
i hope this all make sense and thanks in advance for any answers.
Mat