mocruising
Member
A line goes from the neck of the boom (Close to the mast) down the inside of the boom round a pulley at the end of the boom and then up about three meters round a block and back down to the end of the boom where it is fastened. A second line attached to a cleat at the base of the mast rises up the mast internally round a pulley at the top of the mast and back down to the block from the other line. Why so complicated. A single line up the mast (internally) round the sheave at the top of the mast then down and shackled to the end of the boom would be just as good surely. I am replacing all my running rigging.