tarik
Well-Known Member
Hi Guys,
I am not happy, I'm bloody furious, I'm out of this year's Jester.
After 2 years preparation and loads of new gear etc. Last week end my engine/gearbox started to play up. A weekend run ashore to Calais and back has identified an internal problem. The engine/gearbox will have to be lifted out etc.
There is not enough time for the boatyard and engineers to do this and have it ready before the start date - I have to leave on 17th May to get down to the start.
If it is not too expensive I may be able to get down to Gibraltar - I had planned to call in there on the way back from the Azores.
How about all this year's failed Jesters going next year instead of waiting 4 years?
Any takers?????
David
I am not happy, I'm bloody furious, I'm out of this year's Jester.
After 2 years preparation and loads of new gear etc. Last week end my engine/gearbox started to play up. A weekend run ashore to Calais and back has identified an internal problem. The engine/gearbox will have to be lifted out etc.
There is not enough time for the boatyard and engineers to do this and have it ready before the start date - I have to leave on 17th May to get down to the start.
If it is not too expensive I may be able to get down to Gibraltar - I had planned to call in there on the way back from the Azores.
How about all this year's failed Jesters going next year instead of waiting 4 years?
Any takers?????
David