RogerMayne
New member
Will it work?
Channel Maintenance and Jetty Construction - Scoping Report
Mon 10 Nov 2008
A report into the proposed works in Wells Harbour to support construction and maintenance of the Sheringham Shoal Offshore Windfarm has been published. The report, which has details of the proposals, information about the trial dredging and environmental surveys conducted this Summer and a schedule for the project, can be downloaded using the link below. The report is in Adobe PDF format and can be read or printed provided your computer has the free Adobe Acrobat Reader software installed.
Scoping Report (20Mb PDF document)
http://www.wellsharbour.co.uk/scopingreport28-10-08.pdf
Channel Maintenance and Jetty Construction - Scoping Report
Mon 10 Nov 2008
A report into the proposed works in Wells Harbour to support construction and maintenance of the Sheringham Shoal Offshore Windfarm has been published. The report, which has details of the proposals, information about the trial dredging and environmental surveys conducted this Summer and a schedule for the project, can be downloaded using the link below. The report is in Adobe PDF format and can be read or printed provided your computer has the free Adobe Acrobat Reader software installed.
Scoping Report (20Mb PDF document)
http://www.wellsharbour.co.uk/scopingreport28-10-08.pdf