eddystone
Well-Known Member
Looking at a Bavaria 42 (1999) but would need to modify the existing rig as following:
- fit removable inner forestay so that hanked on storm jib can be fitted and also to be used for twin foresails sailing downwind.
- fittings on mast to attach pole or possibly twin poles stored vertically
- pole lift, additional halyards.
I would be interested if existing or previous owners of these boats had experience of doing similar they could share.
Had long discussion with Allspars Plymouth and they said this can all be achieved. Initially concerned about mounting point for forestay but say can be fitted to stemhead fitting just ahead of anchor locker. I trust their collective knowledge and experience but interested to know how this has been done before.


- fit removable inner forestay so that hanked on storm jib can be fitted and also to be used for twin foresails sailing downwind.
- fittings on mast to attach pole or possibly twin poles stored vertically
- pole lift, additional halyards.
I would be interested if existing or previous owners of these boats had experience of doing similar they could share.
Had long discussion with Allspars Plymouth and they said this can all be achieved. Initially concerned about mounting point for forestay but say can be fitted to stemhead fitting just ahead of anchor locker. I trust their collective knowledge and experience but interested to know how this has been done before.

