MoodySabre
Well-Known Member
and a blot on the view from my house (fortunately a few miles away)
http://www.itv.com/news/meridian/story/2013-03-01/giants-cranes-for-london-gateway/
Talking to a man from the PLA last year he told me that the permanently dredged channel is quite narrow and that there will only be one vessel in Seareach at a time. It's huge investment for one ship at a time - they must be huge ships with a fast turnaround.
http://www.itv.com/news/meridian/story/2013-03-01/giants-cranes-for-london-gateway/
Talking to a man from the PLA last year he told me that the permanently dredged channel is quite narrow and that there will only be one vessel in Seareach at a time. It's huge investment for one ship at a time - they must be huge ships with a fast turnaround.
Last edited: