Bav34
...
This is what I have gleaned from various battery questions:
AmpHours ...... divide watts by volts .... 25W bulb 12v system = 2AH.
Batteries will only supply half their rated AmpHours so my newish service battery (140AH) will only supply 70AH.
Batteries will accept charge more slowly the nearer they get to being fully charged.
OK, if that's all basically true I pretty much know how much power I will take from my 70 available AH's by adding up the wattage of everything I'm using. (Probably very simplistic but that's the way I like it /forums/images/graemlins/ooo.gif)
BUTTTTT
What's with the 60A charging bit?
I know that if I run my engine for an hour that I haven't mystically thrown another 60AH back in ..... if it was that simple why bother with wind gennys and smart charging systems?
So what does an hour of engine running with a 60A 14v alternator actually give me?
And why?
How long would it take to get a battery showing say 12.5 volts up to (fully charged???) 12.7/8 volts at rest?
Please be gentle with me.
AmpHours ...... divide watts by volts .... 25W bulb 12v system = 2AH.
Batteries will only supply half their rated AmpHours so my newish service battery (140AH) will only supply 70AH.
Batteries will accept charge more slowly the nearer they get to being fully charged.
OK, if that's all basically true I pretty much know how much power I will take from my 70 available AH's by adding up the wattage of everything I'm using. (Probably very simplistic but that's the way I like it /forums/images/graemlins/ooo.gif)
BUTTTTT
What's with the 60A charging bit?
I know that if I run my engine for an hour that I haven't mystically thrown another 60AH back in ..... if it was that simple why bother with wind gennys and smart charging systems?
So what does an hour of engine running with a 60A 14v alternator actually give me?
And why?
How long would it take to get a battery showing say 12.5 volts up to (fully charged???) 12.7/8 volts at rest?
Please be gentle with me.