Well winter is here, so the job list begins.....

FullCircle

Well-Known Member
Joined
19 Nov 2003
Messages
28,223
Visit site
Just updated FC's job list from the middle of the season. I felt quite chuffed that I got over 50 items off the list in 2006, but they have been replaced or are of course yearly maintenance.
For the picky beggers amongst you, I have left off the jobs already done.


Get the Wind Instrument fixed (warranty)
Get the Log Instrument fixed (warranty)
Get the Depth Instrument fixed (warranty)
Change from Camping Gaz to Calor and have dual switchable regulators to swap into either.
Auto gas monitor panel
Service the engine, change the anti freeze
Renew Fuel and Water filters all round the boat
Add submersible cleats to transom step for tying off dinghy
Add hardpoint to anchor locker for bitter end
Add halyard tailbag to anchor locker for windlass remote controller
Add graphics to underside of anchor locker lid for chain length marking diagram
Add light to inside of anchor locker
Add lights to inside of engine compartment
Add Cockpit low level lighting
Install permanent ventilator to forecabin hatch
Install underbunk ventilation reticulated foam to aft cabin
Service the outboard
helmsmans seats
remark the anchor chain with yellow paint
t cut and polish hull
t cut and polish cockpit area
racks for plates and cups in galley
dividers for food in galley
rack system for spices in galley
E55059 to Autopilot
NMEA back to Radar
adjust Rudder position sensor
locking turning blocks for cruising chute sheets
locking lugs for harken genoa sheet cheek blocks
binnacle/wheel cover
teak renovation to seat
teak renovation to stern bathing step
handle to stern area
stick stbd rudder boot back correctly
electric keel lift gun installation
varnish flag staff
washboards joining system
washboards storage rack in wet locker
cam cleat for mainsheet
wichard pad eye for second mainsheet position
boom eyes for second mainsheet position
floor kick pad in cockpit
gybe preventer system for main
chafe protection on main at spreader areas
SSR on sails
SOLAS reflection tape on mast
paint SSR on dinghy
install cleat to aft of windlass
Install Pad eye to foredeck for downhaul
Fit new spin pole eye to mast
touch up boot top paint
pole uphaul line
pole downhaul line
dining table new design for folding or extension
clock/barometer
storage drawer in navigator area
shelves in stbd cupboard for glasses
shelves in port cupboard for
1st aid kit mounting above wet locker shelf
service winches
wash all turning blocks
red cover for chart light
red light for galley
red light to mast base underside
red light to heads
engine cover cutout in heads
shelving in heads cupboards
Design and mock up the holding tank installation in the workshop area.
Look at and install 110a alternator in place of current 60a
Install Adverc Smart battery charging
Battery monitor
remark the anchor chain with yellow paint
grease battery terminals
oxalic acid to stbd shroud base rust stain area.
repair windex
change topping lift for dyneema halyard
spinnaker pole to J
change prop
replace shaft anodes
add hull anode
mattress to forecabin
chart locker to forecabin
valet sails
wash all ropes
replace stanchion .oops!
bowsprit
folding worktop over cooker
rudder bearings
lubricate steering gear
wash out autopilot gear
re-epoxy keel.grrr.
lee cloth to forecabin
lee cloth to saloon berth
replace lazyjack lines, add turn blocks

Jim boatfixing earlier 2006


P1010031.jpg
 
Oh well done!
But I missed off installing the lovely electric toilet that is out in the shed /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif
 
That makes me feel soooo much better /forums/images/graemlins/smile.gif I thought I had a lot to do, but its nothing compared to what you've got ahead.

Good luck!
 
Thought i'd share my winter maintenance list with you... see below:

You can come and share mine too, as you have bugger all to do.
 
Mine's all done, 2 weeks out at beginning Oct. for antifoul, seacocks, mast down for rig check, new aerial, tri-colour lamps, anodes, topside polish, sterngland re-pack and rudder drain. Re-stocked with winter ale and grub. Now enjoying the peasures of winter sailing with uncrowded cruising grounds. Jubley /forums/images/graemlins/grin.gif
 
Here it is on the boom. This was very dark, and is just the light from a small compact flash. I use the 3M stuff.

P1010169.jpg


and on the mast, vertical.

PB010006.jpg
 
[ QUOTE ]
Oh well done!
But I missed off installing the lovely electric toilet that is out in the shed /forums/images/graemlins/grin.gif /forums/images/graemlins/grin.gif

[/ QUOTE ]

Hope it's not a Jabsco Conversion.. if it is, DONT DO IT!!!
 
Where do you lot find all these jobs to do? I've only got 2 things on my list:
1. Overhaul the mast, chainplates and rigging
2. Fit an inboard engine to replace the outboard
Oh alright, I lied. There's also a nasty black mark on the transom I've got to wash off.
 
Top