beccaboo
New Member
Following a good period of cutting, sadly the dredger is currently on the hard for impeller repairs and subsequently the number of drying berths (onto very soft silt) is more than I would have hoped. To ensure maneuverability, vessels drawing more than 1.75m are temporarily advised to enter the basin +/-1 hour either side of HW. For further information contact me at the marina. Iain, Marina Manager/Yacht Becca Boo