Watchet Dredging

Attached are some more views but at pontoon level so showing a good perspective of the amount of mud that has been removed, given that we had about 1.5m beneath us and the gate was shut.
These were taken about two weeks ago so more progress will have been made since .
 

Attachments

  • IMG_2472 resized.JPG
    IMG_2472 resized.JPG
    41.1 KB · Views: 45
  • IMG_2470 resized.JPG
    IMG_2470 resized.JPG
    50.8 KB · Views: 51
  • IMG_2471 resized.JPG
    IMG_2471 resized.JPG
    46 KB · Views: 48
Were leaving today, arrived Saturday. 3 berths in on B pontoon, 2.5m draft so well and truly in the mud, looks like we can get out about an hour and a half before HW.
Really good welcome from the guys, so pleased to see us again after so many years.
Obviously work in progress but it's possible now which is great news.
Now the quayside monstrosity building work is another thing....
 
Top