Must there be only a day max between slapping the stuff on and re-launch, or can it be done a week, two weeks even four weeks in advance?
In the past I've done it within two days, but this year that may not be possible.
Does it matter if it is left for weeks, or does it lose its A/F properties?
I have a hectic schedule between now and the last possible date for re-launch in time to make a "muster" on Mull in early May.
I'll be away for four weeks (March/April) and need to have the boat and myself completely ready by April 29th April.
I have a max window of the next two weeks before a panic window in late April.
TIA, as usual :encouragement:
In the past I've done it within two days, but this year that may not be possible.
Does it matter if it is left for weeks, or does it lose its A/F properties?
I have a hectic schedule between now and the last possible date for re-launch in time to make a "muster" on Mull in early May.
I'll be away for four weeks (March/April) and need to have the boat and myself completely ready by April 29th April.
I have a max window of the next two weeks before a panic window in late April.
TIA, as usual :encouragement: