Hi folks.
I wanted to change the thru hulls and seacocks on my Bavaria, but didn't really have the time, so I asked the marina to do it.
What I would like advice on from those familiar with the process, how long do you reckon it would take you to do this job? I have my own ideas which differ considerably from how long it took the marina guys to actually do it, hence my request for some independent time estimates!!!
First of all we are talking 7 x 3/4" for sink/head inlet and 2 x 1.5" for the head outlet. All DZR and each consisting of a thru hull, nut, retaining nut, seacock, elbow bend and hose tail. Standard stuff.
All the old thru hulls and seacocks were already removed by me, so the holes were all ready to do the install. All hoses in situ ready to be attached to the hose tails. Being a relatively modern Bav everything was accessible.. All the fittings were were left out ready for the install. I supplied the 3m4200 and Loctite 577 (which he didn't use) preferring PTFE instead.
So given my preparation for the job, how long do you reckon it would take to install the thru hulls, returning when cured to screw on the seacocks, elbows and hose tails, finally attaching the hoses?
I will tell you all how long I it took (billed for) later after seeing a few of your estimates. Don't want to influence your thoughts!
Cheers.
I wanted to change the thru hulls and seacocks on my Bavaria, but didn't really have the time, so I asked the marina to do it.
What I would like advice on from those familiar with the process, how long do you reckon it would take you to do this job? I have my own ideas which differ considerably from how long it took the marina guys to actually do it, hence my request for some independent time estimates!!!
First of all we are talking 7 x 3/4" for sink/head inlet and 2 x 1.5" for the head outlet. All DZR and each consisting of a thru hull, nut, retaining nut, seacock, elbow bend and hose tail. Standard stuff.
All the old thru hulls and seacocks were already removed by me, so the holes were all ready to do the install. All hoses in situ ready to be attached to the hose tails. Being a relatively modern Bav everything was accessible.. All the fittings were were left out ready for the install. I supplied the 3m4200 and Loctite 577 (which he didn't use) preferring PTFE instead.
So given my preparation for the job, how long do you reckon it would take to install the thru hulls, returning when cured to screw on the seacocks, elbows and hose tails, finally attaching the hoses?
I will tell you all how long I it took (billed for) later after seeing a few of your estimates. Don't want to influence your thoughts!
Cheers.