CliveG
Well-Known Member
Today we have, at long last finished striping and repainting Sirenia's upper works. /forums/images/graemlins/smile.gif
If I happen to meet the previous owner who thought that Sandtex and household gloss would be good for decks etc. I would like to shake him by the neck! /forums/images/graemlins/mad.gif
We also had a visit from dombuckley who kindly offered to do a post repair survey for me.
He has declared her structurally sound with just a few minor items to attend to.
In fact he said that she was in better condition that 2 other Evo 25's he had surveyed and her moisture readings are very low.
Thank you very much Dominic /forums/images/graemlins/smirk.gif /forums/images/graemlins/smirk.gif
Easter weekend should see the keel and engine reinstalled and the new mast up to check lengths of the standing rigging.
Then it is on with replacing the cabin linings and the final wiring.
If all goes well she will feel the water again at the end of this month and be back on her new mooring on the Deben in early May.
If I happen to meet the previous owner who thought that Sandtex and household gloss would be good for decks etc. I would like to shake him by the neck! /forums/images/graemlins/mad.gif
We also had a visit from dombuckley who kindly offered to do a post repair survey for me.
He has declared her structurally sound with just a few minor items to attend to.
In fact he said that she was in better condition that 2 other Evo 25's he had surveyed and her moisture readings are very low.
Thank you very much Dominic /forums/images/graemlins/smirk.gif /forums/images/graemlins/smirk.gif
Easter weekend should see the keel and engine reinstalled and the new mast up to check lengths of the standing rigging.
Then it is on with replacing the cabin linings and the final wiring.
If all goes well she will feel the water again at the end of this month and be back on her new mooring on the Deben in early May.