lumphammer
Well-Known Member
I've taken off the add-on in mast furling system and am replacing with slab reefing with single line reefing for reefs 1 and 2. For convenience because there is more space in the cockpit on the starboard size I would like both reefing lines to come down the mast on the same (STB) side before going to the cockpit.
Is this likely to cause problems or should route one down port side and one down starboard?
Is this likely to cause problems or should route one down port side and one down starboard?