lustyd
Well-Known Member
Just replacing our anchor chain which is now down to about 26m after cutting rusty ends off occasionally.
I’m buying 50m of new chain so unlikely to need the 50m of rope that’s currently spliced to the chain.
I’m considering putting a hard eye in the end of that rope rather than splice it. I don’t like having it unused and going nasty in the bottom of the anchor locker so thinking it can live elsewhere and just shackle on if ever required.
Any thoughts on this? We’re definitely not changing gypsy and downsizing the chain, and don’t want the weight of longer chain so those are out of contention here but interested in thoughts on shackle vs splice.
I’m buying 50m of new chain so unlikely to need the 50m of rope that’s currently spliced to the chain.
I’m considering putting a hard eye in the end of that rope rather than splice it. I don’t like having it unused and going nasty in the bottom of the anchor locker so thinking it can live elsewhere and just shackle on if ever required.
Any thoughts on this? We’re definitely not changing gypsy and downsizing the chain, and don’t want the weight of longer chain so those are out of contention here but interested in thoughts on shackle vs splice.