eddystone
Well-Known Member
Just about to bend sails on for start of (my) season. 2 line slab reefing.
Up till now have taken reefing pennant from cringle down under boom and tied to bracket on opposite side. Originally did that as old mainsail foot ran in track. Now have loose footed.
Not happy with position of bracket for 2nd reef and was about to move but that involves drilling and tapping a new hole for sliding bracket.
Some, including Tom Cunliffe advise tying to boom with a running loop; how can that work?
The bit running from the sheave at the end of the boom to the cringle, which is effectively the outhaul will pull the cringle back from its (loose) attachment to the boom and the clew won’t sit close to top of boom. Thought idea was for pennant to pull down and back a bit which seems impossible with sliding loop.
Or have I got it all wrong?
Up till now have taken reefing pennant from cringle down under boom and tied to bracket on opposite side. Originally did that as old mainsail foot ran in track. Now have loose footed.
Not happy with position of bracket for 2nd reef and was about to move but that involves drilling and tapping a new hole for sliding bracket.
Some, including Tom Cunliffe advise tying to boom with a running loop; how can that work?
The bit running from the sheave at the end of the boom to the cringle, which is effectively the outhaul will pull the cringle back from its (loose) attachment to the boom and the clew won’t sit close to top of boom. Thought idea was for pennant to pull down and back a bit which seems impossible with sliding loop.
Or have I got it all wrong?