oGaryo
Well-Known Member
Just made a todo list for the boat that I need to complete between now and Fenruary.. tis the PM in me that makes me do these scary things
I went in to the todo list thinking I was getting there.. it's like painting the Humber Bridge, a never ending list that just seems to start again when you get to the end of it 
Here's my list so far after a 10min brain dump:
1. fit new brake drums to the trailer x 4
2. fit new 2600kg Bradley pole coupling
3. traile brake cables x 4.. check, service and replace as necessary
4. fit 2 x spare wheel to trailer
5. inflate 4 x new fender and fit ropes
6. install new chartplotter - including DSC connection to radio
7. install XPLod amp in cuddy for dvd/mp3 player
8. remove surface rust from steering coupling in engine bay and protect
9. fit canopy when returned from zip repair specialist
10. reglue cuddy hatch seal
11. reglue carpet by cuddy doorway
12. resecure cuddy door lock
13. refit Helm fascia - recently repaired
14. fill holes in transom where old transducer has been removed
15. sand down filled hull repairs x 2 (minor dinks)
16. repair small tear in seat cushion
17. stud back cuddy lining
18. fit new auto extinguisher in engine bay
19. fit new VHF aerial and program radio with MMSI
20. fill holes in console left by removing old instrumentation
21. fix dodgy temperature gauge
22. check engine and fuel filters replacing if necessary
23. fit RCA and 12v socket replicator in cuddy
24. buy and fit essential rail mount ss bbq
25. fit 2 x ring brackets to secure outboard in storage hold
26. fit snap davits or similar
27. load up Solent maps to chartplotter when new Garmin data card arrives
28. build new driveway extension and drainage system!!
29 install 240v outlets by driveway
30. repair 2 x dodgy instrument panel back lights
31. install winch chain
32 refit prop using new secure washer before taking the boat out
The friggin list just keeps growing !!!!
admitedly much of it is nice to haves though... apart from the bbq of course 
Here's my list so far after a 10min brain dump:
1. fit new brake drums to the trailer x 4
2. fit new 2600kg Bradley pole coupling
3. traile brake cables x 4.. check, service and replace as necessary
4. fit 2 x spare wheel to trailer
5. inflate 4 x new fender and fit ropes
6. install new chartplotter - including DSC connection to radio
7. install XPLod amp in cuddy for dvd/mp3 player
8. remove surface rust from steering coupling in engine bay and protect
9. fit canopy when returned from zip repair specialist
10. reglue cuddy hatch seal
11. reglue carpet by cuddy doorway
12. resecure cuddy door lock
13. refit Helm fascia - recently repaired
14. fill holes in transom where old transducer has been removed
15. sand down filled hull repairs x 2 (minor dinks)
16. repair small tear in seat cushion
17. stud back cuddy lining
18. fit new auto extinguisher in engine bay
19. fit new VHF aerial and program radio with MMSI
20. fill holes in console left by removing old instrumentation
21. fix dodgy temperature gauge
22. check engine and fuel filters replacing if necessary
23. fit RCA and 12v socket replicator in cuddy
24. buy and fit essential rail mount ss bbq
25. fit 2 x ring brackets to secure outboard in storage hold
26. fit snap davits or similar
27. load up Solent maps to chartplotter when new Garmin data card arrives
28. build new driveway extension and drainage system!!
29 install 240v outlets by driveway
30. repair 2 x dodgy instrument panel back lights
31. install winch chain
32 refit prop using new secure washer before taking the boat out
The friggin list just keeps growing !!!!
Last edited: