UKHO Permanent/Preliminary/Temporary Notices:

1. ENGLAND - East Coast - Buoyage. -
A seasonal buoy (yellow) just north of the O2 Arena at Blackwall Point in the River Thames is changed to a permanent lit SHB.
2. DOVER STRAIT - Depths. - One reduction of depth in the SW bound TSS in the Dover Straits south of the Varne lightship. Very unlikely to hinder leisure craft.
3. ENGLAND - East Coast - Depths. - New reduction of depth at the north entrance of the Fisherman’s Gat. Whilst still ample water for us (8.3m) the reduction is over a metre so is significant. Earlier this year there are been two NtM close to the same location which are included in the image provided.
4. ENGLAND - East Coast - NM Blocks. - This notice provides 6 UKHO blocks updating the new jetty at Sheerness Harbour (and reported earlier in the local notices about the construction). Each block is very similar; one example illustrated and each can be seen at the download button. (Notices to Mariners)
5. BELGIUM - Buoy. - In week 20 this year we had a preliminary notice (2082(P)) advising us of a ring of cardinal and special buoys marking the works area for the development of the new Princess Elisabeth Island. This is in Belgium waters east of the Twin special buoy marking the east side of the Noord Hinder TSS. This notice is advising us that the southerly yellow special buoy is deleted. Note that the area within the ring of remaining buoys is a prohibited area.
6. BELGIUM - Foul. Buoy. - New FOUL on the Haut-Fond de Gravelines bank off Gravelines. An earlier notice (1609) this year reported reductions of depth in the same location so all are included in the same image.
7. NORTH SEA - United Kingdom Sector - Automatic Identification Systems. - AIS now installed at the Gas Platform on the Hewitt Gas Field.
Local
1. River Thames - Gravesend Reach - Clubb's Jetty - Fender Replacement Works -
commencing on Friday 21st November for approximately 6 days, fender replacement works will be taking place at Clubb’s Jetty in Gravesend Reach. The exact location is indicated by a red box on the chartlet. (In the Local List on the above quoted web page. Works involve personnel working from a Mobile Elevated Works Platform on the crane barge, hot work and lifting operations utilising Crane Barge ‘THAMES TRANSPORTER’. Safety boat ‘BADGER’ will also be in attendance. Requirements to proceed with caution or at slow speed will be made in accordance with the procedure set out in the Port of London Authority’s Port Information Guide, under ‘Speed Reductions’, with the International Code Flags ‘Romeo Yankee’ displayed. The display of these signals will be in addition to any lights or shapes required under local regulations and the International Regulations for Preventing Collisions at Sea. Further information will be broadcast by London VTS on VHF 68.
2. Harwich Harbour - Survey and Dredging Operations – Update 3 - survey and dredging operations are taking place as follows:
Athos PCRX Survey Start date 22/10/25 End date 22/11/25 Locations All areas
GNH Crusader 2EQW Survey 05/11/25 22/11/25 All areas
James Morgan 3 MSKD5 Survey 05/11/25 15/11/25 HDWC
MTS Valour 9407299 Plough 28/10/25 19/11/25 Harwich Harbour, Stour
Union Topaz + barge 9406427 Tug 10/11/25 08/12/25 Harwich Harbour, HDWC
Union Onyx + barge 9406415 Tug 10/11/25 08/12/25 Harwich Harbour, HDWC
Magnor 9787601 Backhoe 10/11/25 08/12/25 Harwich Harbour, HDWC
Wind Lass 9633812 Multi cat Tug 10/11/25 08/12/25 Harwich Harbour, HDWC
Gateway 9448994 TSHD 01/11/25 15/11/25 Harwich Harbour, Felixstowe
Maverick MGTR9 Water Injection 02/11/25 17/11/25 Harwich Harbour, Stour
Sospan Dau 7711062 TSHD 24/11/25 28/11/25 Harwich Harbour, Stour & Orwell
The backhoe dredger Magnor will be carrying out boulder removal operations in Harwich Harbour and the Harwich Deep Water Channel, with the assistance of multicat tug Wind Lass. Tugs Union Topaz and Union Onyx will be working with split-hopper barges Terraferre 501 and Terraferre 502, to transport boulder material to the Inner Gabbard East disposal site. Gateway and Sospan Dau are carrying out trailing suction hopper dredging (TSHD) work supported by the Maverick and MTS Valour. Gateway will dispose of material at Inner Gabbard, and the Sospan Dau will place material in the designated beneficial sites in the River Stour and River Orwell (see diagram on the Local List in the above quoted web page). Contact Harwich VTS (VHF 71) for more information.
3. Surveyed Depths – Harwich International Port and approaches – Update 2 - latest hydrographic surveys which are published as follows:
Charts & Surveys - Harwich Haven Authority
In the lower River Stour, the significant depths below chart datum (not including berths) are:
• Within area dredged to 8m: minimum depth - 7.9m
• Within area dredged to 9m: minimum depth - 8.7m
For further information contact the Harbour Master Team at Harwich Haven Authority (+44 1255 243030).
4. Surveyed Depths – Halfpenny Pier, Harwich – Update 3 - New hydrographic survey extract for latest depths at Ha’penny Pier and approaches: (see in the Local List)
5. Harwich Haven - Withdrawal of Seasonal Recreational Marks - From 04 November 2025, the following seasonal recreational marks will be withdrawn
Pennyhole
Cork Ledge Racing Mark
Armada Racing Mark
Fox’s
Cobbolds Point Buoy
Dovercourt Bay 6 Yellow Spherical Buoys
Shotley Horse
Speed Limit Marker Buoy
Beacon Hill
Please note that Harwich Shelf East Cardinal Buoy will now remain in position year-round: Harwich Shelf East Cardinal Buoy 51° 56’.84 N 001° 18’07 E
6. London Array Offshore Wind Farm - Jack Up Operations “Ziton Wind” - will be on site carrying out main component exchange works at various locations throughout London Array wind farm. The vessel will be on site approximately from the 01/12/2025 until the 31/01/2026
Jack-Up Vessel: Wind Server has a length of 55.1m, breadth of 18.1m with a draft of 4m. Equipment will be periodically deployed and suspended from the vessel crane during jack up operations. A 500m radius restricted zone will be in place, centred on the Ziton Wind whilst pinned on location.
If access is required to this zone for non-project vessel traffic, authorisation must be requested from the vessel master.

That's it.

:
 
I suspect Harwich Haven Authority are winding me up. No sooner do I post the weekly blurb, do they publish more NtMs! :devilish: (n)🥵🤬

Deployment of New Buoy – W1 Waverider
Mariners are advised a new ‘W1 Waverider’ buoy will be deployed 100m NW of the Sunk W1 buoy in the week commencing 24 November 2025, weather conditions permitting.
Location Position - 51o 52.626’ N 001o 41.036’ E (WGS84 datum) Description - A Datawell wave rider buoy - 90cm spherical yellow buoy with a 2m fiberglass antenna with LED light. Flash sequence is 5 yellow flashes every 20 seconds.

Surveyed Depths – Harwich Harbour - Update 22- latest hydrographic surveys showing depths in Harwich Harbour which are published as follows: Charts & Surveys - Harwich Haven Authority
The controlling depth for deep draught vessels navigating within the harbour area should currently be taken as 15.6m below chart datum, plus height of tide.
Significant depths below chart datum (not including inside berth boxes) are:
• 15.6m - spot soundings between the North West Beach Buoy and Grisle Buoy
• 15.5m - spot soundings between the Grisle Buoy and Shotley Spit Buoy
• 15.4m - spot soundings between the Shotley Spit Buoy and Babergh Buoy
Contact Harwich VTS or Haven Pilots for further information regarding tidal windows.
 