tillergirl
Well-Known Member
Permanent
4 from UKHO
1. 5 reduction of depths at the Eagle shoal, the Colne Bar (two), in the Blackwater near to the Bench Head SHB and one near the Colne Bar buoy. Usual image at: http://www.crossingthethamesestuary.com/page9.html
2. A reduction of depth at one spot in the Warp - unlikely to hinder leisure craft;
3. A 'formal' legend for UKHO charts for warning the extension works of the Greater and Outer Gabbard Wind Farms. Image of course as above;
4. A temporary north cardinal buoy heading for the Slijkgat channel off Holland.
Temporary
1. River Thames - the Oikos Jetty Diving works extended for the 30th October. Small craft ought to be the other side of the Thames but the Divers are working close to the main channel;
2. Harwich Harbour - seasonal buoy removal on or around 23rd October;
3. Salvage of wreck near the Trinity buoy in the Sunk Precautionary Area. Works for 60 days so worth checking anyone coming this way;
4. The Broads - underwater and above water inspections are due to be undertaken on Reedham Swing Bridge: ******Wednesday 9th November 2016 and Somerleyton Swing Bridge: Thursday 10th November 2016
5. The Broads - Closure of Rockland Boat Dike & Rockland Staithe - closed to navigation for essential maintenance dredging Closed: Monday 14 November 2016 until Friday 23 December 2016 & Closed: Monday 9th January 2017 until Friday 20 January 2017
6. Dredging at the Port of Wells.
That's it.
4 from UKHO
1. 5 reduction of depths at the Eagle shoal, the Colne Bar (two), in the Blackwater near to the Bench Head SHB and one near the Colne Bar buoy. Usual image at: http://www.crossingthethamesestuary.com/page9.html
2. A reduction of depth at one spot in the Warp - unlikely to hinder leisure craft;
3. A 'formal' legend for UKHO charts for warning the extension works of the Greater and Outer Gabbard Wind Farms. Image of course as above;
4. A temporary north cardinal buoy heading for the Slijkgat channel off Holland.
Temporary
1. River Thames - the Oikos Jetty Diving works extended for the 30th October. Small craft ought to be the other side of the Thames but the Divers are working close to the main channel;
2. Harwich Harbour - seasonal buoy removal on or around 23rd October;
3. Salvage of wreck near the Trinity buoy in the Sunk Precautionary Area. Works for 60 days so worth checking anyone coming this way;
4. The Broads - underwater and above water inspections are due to be undertaken on Reedham Swing Bridge: ******Wednesday 9th November 2016 and Somerleyton Swing Bridge: Thursday 10th November 2016
5. The Broads - Closure of Rockland Boat Dike & Rockland Staithe - closed to navigation for essential maintenance dredging Closed: Monday 14 November 2016 until Friday 23 December 2016 & Closed: Monday 9th January 2017 until Friday 20 January 2017
6. Dredging at the Port of Wells.
That's it.