Mel
Well-Known Member
On the local news last night they made a strong point that during high winds the existing A14 Bridge closes as large lorries have problems. So getting to Felixstowe only leaves them with one choice - through Ipswich. That then gridlocks Ipswich so a second crossing will solve this.
If high winds are the main problem then that implies that the new bridge will have be low/ out of the wind !
I guess they will have to stop yachts using Debbage's and the Ipswich Docks as clearance for a yacht mast and low bridges do not mix !
It will be interesting to see how the artistic Architects deal with this practical aspect,
If high winds are the main problem then that implies that the new bridge will have be low/ out of the wind !
I guess they will have to stop yachts using Debbage's and the Ipswich Docks as clearance for a yacht mast and low bridges do not mix !
It will be interesting to see how the artistic Architects deal with this practical aspect,