pcatterall
Well-Known Member
I want to add rope to my anchor chain. On my last boat I used octoplait and spliced according to some PBO instructions. It looked sound and I was confident with the result.
This time I have spare 3 strand on board and would like to use that. Flying out to boat in France and no decent chandlers where the boat is moored.
I see that the recent PBO method( July 2013) shows the rope sort of 'back spliced' through the last link of the chain. Does this not subject the strands through the link to a lot of wear where they 'bend' back on themselves?
There seem only to be two strands of the rope through the link, is this not a weak point?
This time I have spare 3 strand on board and would like to use that. Flying out to boat in France and no decent chandlers where the boat is moored.
I see that the recent PBO method( July 2013) shows the rope sort of 'back spliced' through the last link of the chain. Does this not subject the strands through the link to a lot of wear where they 'bend' back on themselves?
There seem only to be two strands of the rope through the link, is this not a weak point?