statgar
Well-Known Member
Lovely boat the 43AC shame they dropped the format like Princess with the 435! wish I had the luxury of taking the panels home that said it does look as though I can clean these panels in situ if I'm careful with a good vacuum. I most cases the side and heading panels are easily removed which should cover the edges when replaced, wish me luck but I'd still rather get it done by a professional!I’m in the middle of this job on a 43AC. I got the materials from Boyriven in Andover. They take your chosen vinyl and have the roll foam backed, takes 4-5 weeks.I found that if you want neat joints you have to take it back to how Fairline built it which involves removing door frames and cupboards and non structure walls as well as all the ceiling. I’m no expecting to take 4 months working about 4 days a week. That’s for all the vinyl walls and ceiling’s. I take all the removed panels home to do the work in my garage. No way would I have enough room on the boat
Regards
Terry