peterjaw
Well-Known Member
Hi guys,
I asked the Quicksilver and Merry Fisher dealers in Taiwan to provide quote and also the lead-time. Surprisingly, the lead-time of both are as long as 9 ~ 10 moths. That means, when my new boat arrives in Taiwan, the summer is just about over. August and September are typhoon season in Taiwan.
This just draws me back and freeze my passion immediately.
Did you wait for such a long time when buying a boat?
ps. I choose the standard packs, no any special requirement.
I asked the Quicksilver and Merry Fisher dealers in Taiwan to provide quote and also the lead-time. Surprisingly, the lead-time of both are as long as 9 ~ 10 moths. That means, when my new boat arrives in Taiwan, the summer is just about over. August and September are typhoon season in Taiwan.
This just draws me back and freeze my passion immediately.
Did you wait for such a long time when buying a boat?
ps. I choose the standard packs, no any special requirement.