steve yates
Well-Known Member
Having just drilled, decored and filled out 145 holes in my Longbows deck, due to cabin leaks and patches of rotten core (all replaced now) from deck fittings, I have discovered that the primary culprit was the hatch garage and grab rails. The dog house was only a minor contributor, though I had suspected it was the main cause.
I was surprised to find that both hatch garage and doghouse were just screwed into the deck and am inclined to through bolt them with large washers when I put them back.
Any particular reason why I should just screw them down like previously? Apart from laziness as it would be simpler not trying to be in two places at once if bolting them
. Am I overthinking the idea they should be through bolted?
Thanks.
Ps, I had thought that westerly used encapsulated nuts with their hatch garages, and indeed in my original hunt for leaks I unearthed one, but on removing the garage and drilling out all the holes there were no more to be seen.
I was surprised to find that both hatch garage and doghouse were just screwed into the deck and am inclined to through bolt them with large washers when I put them back.
Any particular reason why I should just screw them down like previously? Apart from laziness as it would be simpler not trying to be in two places at once if bolting them
Thanks.
Ps, I had thought that westerly used encapsulated nuts with their hatch garages, and indeed in my original hunt for leaks I unearthed one, but on removing the garage and drilling out all the holes there were no more to be seen.