ColinR
Well-Known Member
Does anyone have a nifty technique for doing this? When I pole out the genoa I get the pole all set up first with uphaul, downhaul etc and the sheet running through the end of the pole, then gybe sail over and haul sheet in. But if I then want to change to the other tack I dont have a very organised way of gybing given that I dont want to take the pole off the mast fitting when its under load.
cheers, Colin
cheers, Colin