savageseadog
Well-Known Member
There is seawater leak from a laminated join between two GRP prefabrications on grinding a section away a tiny unfilled void is found where the two parts meet. The water is finding its way up where the two fabrications meet a bulkhead which has been cut away. Is injecting possibly thickened epoxy into the void a good enough repair or is it a grind everything away and re-laminate job?