Moodyjim
Well-Known Member
I wish Zig, the new Whisker Pole was shipped yesterday so that the mast track can be altered to fit, the new Mikuni heater goes in a week or so to be fitted, the second-hand water-maker goes out in a week to be fitted, most of the stainless steel work now done but drogue fittings to be worked out, last of the electrics almost finished. Just a small list of other outstanding jobs to complete plus the lack of power from the engine to sort out and the palace will be ready to go!!!!
I worked the route out on "My Maps" (Google) which is subject to change but I can email you the link if you want to look at it?
Jim
I worked the route out on "My Maps" (Google) which is subject to change but I can email you the link if you want to look at it?
Jim