burgundyben
Well-known member
Yesterday, it took 2 bloody hours to get the electric working, and as it had been off it was bloody cold in the tent. But then, I sanded inside the bog, removed the bog and sanded round where it had been. Then undercoated the top half in the bog but it’s a bit confined and I was getting my elbows and knees all over the bits I had done so I undercoated the other side of the shelves for the cabin.
Then, today, I went off to Bampton’s and bought the new bit of wood (£14.75)which is now a bog door, finished undercoating inside the bog, sanded shelves, went to the shop and got a ham and cheese slice and pork pie and drank my flask of coffee, then my dad turned up and said ‘you’ve got a lot to do’, drilled some screw holes for the rear cockpit seat at 10mm and inserted some of those nice little brass csk screw cups, then took them out and epoxied them back in, then brummer wood stopper’d around them, then primered one side of the bog door.
"Who was he?"
Then, today, I went off to Bampton’s and bought the new bit of wood (£14.75)which is now a bog door, finished undercoating inside the bog, sanded shelves, went to the shop and got a ham and cheese slice and pork pie and drank my flask of coffee, then my dad turned up and said ‘you’ve got a lot to do’, drilled some screw holes for the rear cockpit seat at 10mm and inserted some of those nice little brass csk screw cups, then took them out and epoxied them back in, then brummer wood stopper’d around them, then primered one side of the bog door.
"Who was he?"