Boo2
Well-Known Member
Hi,
I'm just about to order a new bespoke fuel tank from Tek-Tanks and I need to decide what fittings to get, engine is a Nanni N.38 marine diesel and the boat is a UFO 34.
The original tank has the fuel feed from front face at the port bottom, return ditto port top, fill on top and vent is on aft face near top port side. I understand that it's now preferred to take all lines from the top of the tank, but space is obviously restricted by the cockpit floor and post-installation access will be non-existant so can anyone tell me how important that actually is in practice ? Do any of the coding rules require it ?
I need to know what fittings to order as well, old tank had the following :
Vent : 1/2 thread fitting in rear face of tank
Fill: 50mm diameter short tube on top of tank. There is a small deck plate central aft in the cockpit covering this.
Feed: fuel cock feeding ?? 3/16" ?? copper pipe, new is 8mm according to engine spec sheet
Return: flexible pipe fitting forgot to measure dia.
Any advice on what to do in terms of fitting types and locationswith the new tank would be gratefully received, especially if there are any UK/international regulations worth knowing about.
Thanks,
Boo2
I'm just about to order a new bespoke fuel tank from Tek-Tanks and I need to decide what fittings to get, engine is a Nanni N.38 marine diesel and the boat is a UFO 34.
The original tank has the fuel feed from front face at the port bottom, return ditto port top, fill on top and vent is on aft face near top port side. I understand that it's now preferred to take all lines from the top of the tank, but space is obviously restricted by the cockpit floor and post-installation access will be non-existant so can anyone tell me how important that actually is in practice ? Do any of the coding rules require it ?
I need to know what fittings to order as well, old tank had the following :
Vent : 1/2 thread fitting in rear face of tank
Fill: 50mm diameter short tube on top of tank. There is a small deck plate central aft in the cockpit covering this.
Feed: fuel cock feeding ?? 3/16" ?? copper pipe, new is 8mm according to engine spec sheet
Return: flexible pipe fitting forgot to measure dia.
Any advice on what to do in terms of fitting types and locationswith the new tank would be gratefully received, especially if there are any UK/international regulations worth knowing about.
Thanks,
Boo2
Last edited: