KAM
Well-Known Member
Anyone know how to judge correct tension in these. The shrouds are attached to a deck mounted plate then the loads are taken through twin tie rods to a strong point on the water line of the hull. They were removed for servicing and have been replaced. It seems a good idea to have some pre load on these to avoid strain on the deck. How much. It would be difficult to apply a measured torque due to friction and access problems.