Neil
Well-Known Member
Last year I used Cruiser Uno, put a second coat on as soon as the first was dry to the touch and was very disappointed at the result; much growth within months. This year, I bought Micron II. It says on the tin, "re-coat after 10hr". Since I want to put the reg 4 coats on the water line and rudder, (especially the rudder!), this represents a considerable time out of the water - I pay for lift in and lift out if it's more than the day.
I've read on here that you don't need to wait for the full recoat time, but I'm leery of not doing a proper job..............
I've read on here that you don't need to wait for the full recoat time, but I'm leery of not doing a proper job..............