Thanks I had the chartlet, but not the detail of the turbine layout. Now I understand - the 3 incomplete rows I saw were the last 6 turbines on the NE end. In that case, I think all the pedestals are there already, and about 4 of the windmills.
 
48 turbines @ 3.6 mw ea. 172mw total .... £1m day income from generating expected.
I know you posted this a long time ago but there's something quite remarkable about these figures. You see, to get £1m per day on an output of, at 100%, 4.15mKwh per day, Dong are being paid just over 20p per kwhr and the electricity cost to my house is *only* 10p per kwhr. I thought the ROC subsidy was about 5p per kwhr but, it must be much much higher.

For comparison, Drax sold its power to the grid for 3.5 to 5p per kwh last year.
 