Richard10002
Well-Known Member
IMO a sensible way forward would be to run some heavy cables to a junction box local to the Coolfreeze's intended location and to connect the socket close to this using lighter cable. The same size as the supplied lead perhaps.
Sounds like a plan. The heavier cable could even terminate at a fused switch panel, thus introducing some future proofing, or improvement of the existing wiring.