boatone
Well-Known Member
You may be interested to know that the new moorings at Wallingford are not EA 24 hour moorings but a South Oxfordshire District Council (who funded and carried out the work) project which the EA supported.
I asked the EA what depth of water was available and they tell me that the bankside was dredged to a depth of more than 1 metre throughout the length, and all the dredged material was used to backfill up to the new landing level.
Also a water-point, pump-out station and electric hook-ups points throughout feature in the moorings design, have planning consent and the ducting is in place. However, they have not been done yet because the funding ran out.
I asked the EA what depth of water was available and they tell me that the bankside was dredged to a depth of more than 1 metre throughout the length, and all the dredged material was used to backfill up to the new landing level.
Also a water-point, pump-out station and electric hook-ups points throughout feature in the moorings design, have planning consent and the ducting is in place. However, they have not been done yet because the funding ran out.
Last edited: